(Registrieren)

Oremex Release Results From Diamond Drill Program at Tejamen Silver Property

Geschrieben am 03-08-2007

Vancouver, Canada (ots/PRNewswire) - Oremex Resources Inc. (TSX-V:
ORM) (the "Company") announces that it has received final results of
a ten-hole drill program completed at its Tejamen Silver Property
("Tejamen") in 2006. Receipt of assay results for these holes was
delayed due to administrative difficulties in Mexico. The holes were
drilled to twin some of the reverse circulation drill holes, provide
samples for rock strength testing on the periphery of the proposed
pits, and to provide samples for metallurgical testing in the two
mineralized zones. Diamond drill ("DD") holes DD-1 to DD-4 tested
the Cerro Prieto zone, diamond drill holes DD-5 and DD-6 tested
mineralization within the Los Mantos zone while holes DD-7 to DD-10
were primarily drilled to provide samples for rock mechanics
testing.

Hole DD-1 was sited between reverse circulation ("RC") holes RC-1
and  RC-2, and showed good correlation with mineralized intercepts in
both holes as follows:


-------------------------------------------------------------------------
Ag
Drill Interval Metres Ag (grams (ounces
Hole (metres) (feet) per tonne) per ton)
-------------------------------------------------------------------------
DD-1 18-84 66 (216.5) 59.5 1.74
-------------------------------------------------------------------------
Incl. 38-50 12 (39.1) 127.5 3.72
-------------------------------------------------------------------------
RC-1 16-82 66 (216.5) 78.5 2.30
-------------------------------------------------------------------------
Incl. 24-36 12 (39.4) 113.0 3.31
-------------------------------------------------------------------------
RC-2 16-108 92 (301.8) 39.1 1.15
-------------------------------------------------------------------------
Incl. 26-54 28 (91.8) 50.0 1.46
-------------------------------------------------------------------------
Incl. 88-116 28 (91.8) 54.1 1.58
-------------------------------------------------------------------------
Hole DD-2 twinned Hole RC-7 and also showed good correlation with
respect to grades and thicknesses as follows:
-------------------------------------------------------------------------
Ag
Drill Interval Metres Ag (grams (ounces
Hole (metres) (feet) per tonne) per ton)
-------------------------------------------------------------------------
DD-2 36-96 60 (196.8) 138.4 4.05
-------------------------------------------------------------------------
Incl. 48-76 28 (91.3) 253.7 7.40
-------------------------------------------------------------------------
And 112-128 16 (52.5) 32.1 0.94
-------------------------------------------------------------------------
RC-7 36-102 66 (216.5) 104.5 3.05
-------------------------------------------------------------------------
And 130-140 10 (32.8) 176.2 5.15
-------------------------------------------------------------------------
And 150-164 14 (45.9) 35.1 1.02
-------------------------------------------------------------------------
Hole DD-3 was drilled 25 metres south of Hole RC-8:
-------------------------------------------------------------------------
Ag
Drill Interval Metres Ag (grams (ounces
Hole (metres) (feet) per tonne) per ton)
-------------------------------------------------------------------------
DD-3 62-78 16 (52.5) 38.6 1.13
-------------------------------------------------------------------------
98-114 16 (52.5) 52.7 1.54
-------------------------------------------------------------------------
Incl. 102-104 2 (6.6) 135.5 3.96
-------------------------------------------------------------------------
Incl. 112-114 2 (6.6) 216.2 6.32
-------------------------------------------------------------------------
RC-8 84-104 20 (65.4) 118 3.45
-------------------------------------------------------------------------
Hole DD-4 was drilled between holes RC-28 and RC-29:
-------------------------------------------------------------------------
Ag
Drill Interval Metres Ag (grams (ounces
Hole (metres) (feet) per tonne) per ton)
-------------------------------------------------------------------------
DD-4 24-110 86 (280.4) 26.8 0.78
-------------------------------------------------------------------------
Incl. 52-58 6 (19.6) 51.3 1.50
-------------------------------------------------------------------------
Incl. 70-74 4 (13.1) 48.6 1.41
-------------------------------------------------------------------------
Incl. 106-110 4 (13.1) 48.0 1.40
-------------------------------------------------------------------------
RC-28 14-82 68 (223.0) 81.6 2.38
-------------------------------------------------------------------------
RC-29 56-80 24 (78.7) 114.2 3.34
-------------------------------------------------------------------------
In the Los Mantos zone, Hole DD-5 was drilled between holes RC-97 and 
RC-98:
-------------------------------------------------------------------------
Ag
Drill Interval Metres Ag (grams (ounces
Hole (metres) (feet) per tonne) per ton)
-------------------------------------------------------------------------
DD-5 0-36 36 (118.1) 49.5 1.45
-------------------------------------------------------------------------
Incl. 28-32 4 (13.1) 168.6 4.91
-------------------------------------------------------------------------
48-60 12 (39.4) 34.0 1.00
-------------------------------------------------------------------------
RC-97 14-152 138 (452.6) 105.5 3.08
-------------------------------------------------------------------------
RC-98 0-4 4 (13.1) 57.5 1.68
-------------------------------------------------------------------------
32-54 22 (72.2) 24.3 0.71
-------------------------------------------------------------------------
Hole DD-6 was drilled between Holes RC-78 and RC-79:
-------------------------------------------------------------------------
Ag
Drill Interval Metres Ag (grams (ounces
Hole (metres) (feet) per tonne) per ton)
-------------------------------------------------------------------------
DD-6 8-24 16 (52.5) 19.7 0.57
-------------------------------------------------------------------------
And 42-60 18 (59.0) 50.7 1.48
-------------------------------------------------------------------------
RC-78 62-78 16 (52.5) 549.4 16.09
-------------------------------------------------------------------------
And 110-150 40 (131.2) 84.1 2.46
-------------------------------------------------------------------------
RC-79 64-82 18 (59) 71.4 2.09
-------------------------------------------------------------------------
And 116-154 38 (124.6) 88.1 2.50
-------------------------------------------------------------------------


Holes DD-7 to DD-10, drilled near the proposed pitwalls for the
open pit in the Los Mantos zone, encountered relatively narrow widths
of silver mineralization. Core samples taken from these holes were
utilized by Call & Nicholas of Tuscon, Arizona for completion of
their geotechnical review of the Tejamen property. Their report
concluded that overall geotechnical conditions are favourable at the
property and their findings generally supported the pit slope angles
utilized in the independent Preliminary Assessment Study completed
by Snowden Mining Industry Consultants in 2006.

All intercepts are reported as drilled; true widths have not been
calculated. Diamond drill samples were collected, logged and split
following standard industry practice and were analyzed by
Inspectorate America Corporation using 30 element ICP with a fire
assay technique with a gravimetric finish for gold and silver. Linda
Thorstad, P. Geo., is the qualified person who reviewed the data as
received from the assay lab.

The Tejamen deposit remains open at depth and in several
directions for future exploration. The Company is continuing
discussions with the Ejido for long term access to surface rights at
the project.

The TSX Venture Exchange has not reviewed and does not accept
responsibility for the adequacy and accuracy of this release.

Forward-Looking Statements: The above contains forward-looking
statements that are subject to a number of known and unknown risks,
uncertainties and other factors that may cause actual results to
differ materially from those anticipated in our forward-looking
statements. Factors that could cause such differences include:
changes in world commodity markets, equity markets, costs and supply
of materials relevant to the mining industry, change in government
and changes to regulations affecting the mining industry.
Forward-looking statements in this release include statements
regarding future exploration programs, operation plans, geological
interpretations, mineral tenure issues and mineral recovery
processes. Although we believe the expectations reflected in our
forward-looking statements are reasonable, results may vary, and we
cannot guarantee future results, levels of activity, performance or
achievements.

ots Originaltext: Oremex Resources Inc.
Im Internet recherchierbar: http://www.presseportal.de

Contact:
For further information: Linda Thorstad, M.Sc., P.Geo. Chief
Executive Officer, T: +1-604-683-5651, E: linda.thorstad@oremex.com


Kontaktinformationen:

Leider liegen uns zu diesem Artikel keine separaten Kontaktinformationen gespeichert vor.
Am Ende der Pressemitteilung finden Sie meist die Kontaktdaten des Verfassers.

Neu! Bewerten Sie unsere Artikel in der rechten Navigationsleiste und finden
Sie außerdem den meist aufgerufenen Artikel in dieser Rubrik.

Sie suche nach weiteren Pressenachrichten?
Mehr zu diesem Thema finden Sie auf folgender Übersichtsseite. Desweiteren finden Sie dort auch Nachrichten aus anderen Genres.

http://www.bankkaufmann.com/topics.html

Weitere Informationen erhalten Sie per E-Mail unter der Adresse: info@bankkaufmann.com.

@-symbol Internet Media UG (haftungsbeschränkt)
Schulstr. 18
D-91245 Simmelsdorf

E-Mail: media(at)at-symbol.de

85017

weitere Artikel:
  • Mitteldeutsche Zeitung: Chemieunternehmen Leuna/Investition / Katalysator-Hersteller investiert 30 Millionen Euro in Leuna Halle (ots) - Leuna. Das Chemieunternehmen Kataleuna baut sein Werk in Leuna aus. Das Tochterunternehmen der US-Konzerns CRI Criterion will für rund 30 Millionen Euro eine zweite Anlage zur Produktion von chemischen Katalysatoren errichten, berichtet die in Halle erscheinende Mitteldeutsche Zeitung (Freitag-Ausgabe). "Wir wollen unsere Produktionskapazität verdoppeln", sagte Kataleuna-Chef Frank Görlitz dem Blatt. Das Unternehmen mit derzeit 90 Beschäftigten will etwa 20 neue Mitarbeiter einstellen. Spatenstich soll schon im September mehr...

  • GLG Partners meldet am 3. August 2007 Finanzergebnisse des zweiten Quartals 2007 London (ots/PRNewswire) - GLG Partners ("GLG"), ein führendes Verwaltungsunternehmen für alternative Vermögenswerte, das kürzlich eine umgekehrte Übernahmetransaktion mit Freedom Acquisition Holdings ("Freedom") (Amex: FRH) gemeldet hatte, wird am Freitag, den 3. August 2007, seine Finanzergebnisse für das zweite Quartal zum 30. Juni 2007 bekannt geben. GLG wird am Freitag, den 3. August 2007 um 11:00 Uhr EDT (New York City) / 16:00 Uhr BST (Guernsey/London) eine Telefonkonferenz veranstalten, um seine Finanzergebnisse zu erörtern. mehr...

  • UHV: Neue Technologie verspricht Unterstützung bei der Deckung des künftigen Strombedarfs Genf, Schweiz (ots) - Die führenden Experten im Bereich Ultrahochspannung oder UHV (Ultra High Voltage) beginnen, die technischen und die Sicherheitsspezifikationen für diese vielversprechende neue Technologie zu definieren, mit deren Hilfe der gestiegene Strombedarf gedeckt werden kann. Die Ultrahochspannung könnte eine Lösung in Bezug auf den Mehrbedarf an Strom in einer räumlich beengten Welt anbieten. Zu den im Bereich dieser Technologie aktiven Ländern zählen Brasilien, Kanada, China, Japan, Russland und die USA. Die Internationale mehr...

  • Öffnet sich der ungarische Telekommunikationsmarkt für neue Marktteilnehmer? München/Budapest (ots) - Die Versorgung mit Telekommunikationsdiensten in Ungarn hat sich innerhalb weniger Jahre von einer Mangelverwaltung zu einem kompetitiven Markt mit westlichen Standards entwickelt. Hohe ausländische Investitionen in eine überschaubare Anzahl von Festnetz- und Mobilfunkunternehmen anstatt eines Wettbewerbs von vielen kleinen und mittelgroßen Anbietern haben den Markt direkt von einem Monopol in ein Oligopol verwandelt. Aus Sicht potenzieller neuer Marktteilnehmer war der ungarische Telekommunikationsmarkt bislang mehr...

  • WISAG und APCOA in strategischer Allianz verbunden / APCOA übernimmt die WISAG Parkraum Service GmbH Frankfurt (ots) - Die WISAG-Gruppe (Frankfurt) und die APCOA-Gruppe (Stuttgart) haben eine strategische Allianz zur Stärkung ihres jeweiligen Kerngeschäftes vereinbart. Im Zuge der geschlossenen Verträge übernimmt APCOA rückwirkend ab 01. Januar 2007 die Parkraum-Service Aktivitäten der WISAG. Der Zusammenschluss steht unter dem Vorbehalt der Freigabe durch das Bundeskartellamt. Im Gegenzug ergänzt die WISAG das APCOA-Angebot zukünftig mit FM-Dienstleistungen. Die breite Kundenbasis der beiden in ihren jeweiligen Märkten führenden mehr...

Mehr zu dem Thema Aktuelle Wirtschaftsnews

Der meistgelesene Artikel zu dem Thema:

DBV löst Berechtigungsscheine von knapp 344 Mio. EUR ein

durchschnittliche Punktzahl: 0
Stimmen: 0

Bitte nehmen Sie sich einen Augenblick Zeit, diesen Artikel zu bewerten:

Exzellent
Sehr gut
gut
normal
schlecht